Projects and works for roads and viaducts in Sicily
Type of work: Road Works
Client: ANAS - National Roads Authority - General Directorate, Rome
Location: Agrigento - Caltanissetta
Total amount:
€117,000,000.00
Upgrade to four lanes of the SS 640 of Porto Empedocle - Section from Km 9+800 to Km 44+400.
Type of work: Road Works
Client: ANAS - National Roads Authority - General Directorate, Rome
Location: Syracuse
Total amount: €17,417,174.73
Completion date: 2014
Construction of the Floridia - Syracuse road axis aimed at reducing accidents, increasing traffic flow, through the construction of a main road with one lane per direction of travel and two service roads intended for local traffic.
As part of the project, a bridge with a 3-span structure was built, with spans of 60, 90, and 60 metres respectively.
Type of work: Road Works
Client: Consortium for Sicilian Motorways - Messina
Location: Syracuse - Gela
Total amount: €44,241,547.30
Completion date:
Construction of Lot 3 "Avola", contract number 184 dated 24/11/2000.
The construction of the piers with climbing formwork was carried out as part of the works for the construction of Lot 3 - Avola - of the A18 Syracuse - Gela.
Type of Work: Roadworks
Client: Consortium for Sicilian Motorways – Messina
Location: Section from Syracuse to Rosolini
Total Amount: €18,923,321.20
Completion Date: 2018
Execution of the works and supply of materials necessary for the redevelopment of the operational section Syracuse - Cassibile, including the wearing course and final horizontal road markings for Lots 3, 4, and 5.
For this project, the base layer was constructed using the cold recycling technique of the existing bituminous layers. To extend the service life of the pavement, a fibre-reinforced binder course was used.
Type of Work: Roadworks
Client: Municipality of Noto
Location: Noto (SR)
Total Amount: €251,158.07
Contract Purpose:
Extraordinary maintenance of the road network in the urban centre of the Municipality of Noto
Type of Work: Roadworks
Client: ANAS – National Road Authority, General Directorate, Rome
Location: Syracuse – Cassibile
Total Amount: €37,693,376.02
Contract Purpose:
Construction works for the Catania – Syracuse road section, specifically between Passo Martino and km 130+400 of the SS 114. The project includes the road embankment construction between the north abutment of the San Calogero bridge and the end of the section, excluding: Reinforced concrete structures of the Porcaria and Mulinello viaducts, Bituminous pavements, Safety barriers, Signag, Technological systems, Works without predefined unit prices.
Type of Work: Roadworks
Client: Regional Province of Syracuse
Location: Floridia – Cassibile
Total Amount: €3,388,820.34
Contract Purpose:
Upgrading and modernisation works on S.P. No. 12 Floridia – Cassibile